Usually, we would hire a grab truck to get rid of rubble waste, but we didn’t really have enough to warrant it (although, in hind-sight, our backs would hurt a lot less!), plus we had some other rubbish in the trailer waiting to go to the tip, so we had a skip delivered!

 

Then we got down to putting down our next layer of DPM, after giving the floor a final clean:

IMG_20180711_203538IMG_20180711_214709

Unfortunately, the oversight came in a little bit too high for our 100mm insulation, so we are going to swap it out for 75mm – hopefully that means that we can have the liquid screed be level with the rest of the house!

 