Next on our new kitchen todo list was to bring up the existing floor. We need to dig up 12″.
The floor is made up of a 2″ screed, 2″ concrete with rebar, 8″ dirt/sand/gravel.
This will allow us to install our wet underfloor heating system with the correct amount of insulation, and it’ll match the height of the other floors in the house.
A timelapse of day 1:
We are very thankful for everyone that gave us a hand with it – we couldn’t have done it without you!