With the concrete lorry off of the driveway, more jobs could be completed.


Such as, putting in the flashing, the guttering, the uPVC boards, wood for the inside of the car port, and cementing in the drainage:

The fire-rated door inbetween the garage and the utility room has been started, as well as the waste for the sinks and washing machines:

The doorway into the kitchen has been moved a foot so that we can fit the new kitchen in:



img_20170224_154251using it might be a little bit diffcult!